I only received one technical non conformance but it was out of my hands. The house is empty and has previously installed some new sockets in the living room. All my tests were spot on at the time and obtained similar continuity tests on the L-L and N-N. however, it was clear the plasterer had been in since I was there as I pulled the sockets off and behind them were covered in dry plaster. First job to show the assessor and could have died. Assured him that this wasn't the case previously with the readings but he still had to note it as a technical non conformance. He said that there's probably a chance that moisture had gotten in or they had pulled forward sockets elsewhere in the house. Not good - was on edge as it was. L-L was 0.89 and N-N was 0.45 which was incorrect from last time
16 minutes ago ·
More