B
brizospark
My latest annoyance is this joiner I am doing work for, he is throwing a fair bit of work my way so can't complain on that score but I am getting really annoyed at his lack of consideration for my part of the job. Went up to start wiring an extension last week and, not for the first time all kingspan insulation had been put in place in walls and floors and even worse he had actually nailed the floor down, leaving me a small hatch that only let me into under section, about a quarter of this extension, dwarf walls were stopping me from getting under where the socket, switches positions.
What should have been a half hour job roughing out a ring circuit ended up taking half a day because the only way round to the sockets was through the new joists, some of which were 4 and 5 pieces of CLS timber thick! There were some area that I couldnt drill through this timber and I had to notch a channel with a chisel and clip the t&e in the channel and then he had the cheek to complain about it! He has actually made his own life more difficult because when he puts his sheets on he is going to have to take care not to hit any of these cables.
Job could have been done the right way if he just held off until cables were in, this guy has been a joiner for 35 years surely he should know!
What should have been a half hour job roughing out a ring circuit ended up taking half a day because the only way round to the sockets was through the new joists, some of which were 4 and 5 pieces of CLS timber thick! There were some area that I couldnt drill through this timber and I had to notch a channel with a chisel and clip the t&e in the channel and then he had the cheek to complain about it! He has actually made his own life more difficult because when he puts his sheets on he is going to have to take care not to hit any of these cables.
Job could have been done the right way if he just held off until cables were in, this guy has been a joiner for 35 years surely he should know!