Hi am new to forum. Just had 4.5day bathroom installation. Bathroom v good however was told on initial survey we wont need to touch your electrics - was keeping original Mira Sport shower and spotlights. Day 1 was then told "our sparky wont pass them, you need new spots, need bathroom rewire" this then led to "need new fuse board with rcd" ok. ÂŁ480. Ok. We have a hotwater tank that was on a Diall timer (and worcester bosch CH only boiler) only moved in 1 month ago but worked perfectly timed at night on economy 7 tariff. Discovered to horror on thursday that timer been removed "cos its not safe" think timer fine, i still have it, but there was no trip for it on new fuseboard, something about incorrect current loop? So to stop a permanent tripping out theyve replaced timer with a fused manual on/offswitch? Wire from top of tank old and casing snapped of in places - not replaced. Ongoing argument about this but they say sparky says "its now safe". Other plumbing issues, leaking sink, stole my existing shower head replaced it with naff plastic one. No reasons given.My husband has paid them in full my question is what is safe/advisable re hot water tank and what paperwork should i have re installation of fuse board/new spots/partial bathroom rewire/extractor etc. I spoke to the sparky on Tuesday in person he was knowledgeable but they got him to complete job wen i was out on Wednesday. (I was told Thursday and had booked the day off )Bathroom company say "there is no paperwork" they came highly recommended but since found out they never issue paperwork even receipts! What should i have been given and how do i get it tested to make sure its now safe? Electrician said on Tuesday i ideally need a whole house rewire this would be "ÂŁ3to5k"? It looks like its black/red cabling which is ok but been diy-ed. Family member who does commercial looked it over before the bathroom debacle started when on old fuse box said it was safe but didnt test sockets etc. Tearing hair out here, please help. They sending sparky back next week as gesture of goodwill but i dont know whether to use him/report to trading standards? I've no leverage cos husband paid thank you
 
Hayley, legally you have no right to see their receipts for materials unless you had an agreement on that basis. It is standard practice for Companies to make money on components/hardware on the basis of volume discounts and handling fees, after all someone has to order the parts and manage the process and this is an overhead cost to the business.

With regards to a VAT invoice, Article 13 of the VAT Regulations 1995 (SI 1995/2518) specifies that a VAT registered business is required to supply a proper VAT invoice when requested to do so by a VAT registered customer in order for the customer to reclaim the correct VAT amount. You are not a VAT Registered customer so therefore a VAT invoice of irrelevant as far as you are concerned. That said most invoicing systems include the VAT element simply to keep the software simple, otherwise there would be a need for two receipt systems.
 
Hayley, legally you have no right to see their receipts for materials unless you had an agreement on that basis. It is standard practice for Companies to make money on components/hardware on the basis of volume discounts and handling fees, after all someone has to order the parts and manage the process and this is an overhead cost to the business.

With regards to a VAT invoice, Article 13 of the VAT Regulations 1995 (SI 1995/2518) specifies that a VAT registered business is required to supply a proper VAT invoice when requested to do so by a VAT registered customer in order for the customer to reclaim the correct VAT amount. You are not a VAT Registered customer so therefore a VAT invoice of irrelevant as far as you are concerned. That said most invoicing systems include the VAT element simply to keep the software simple, otherwise there would be a need for two receipt systems.
Thanks. I understand exactly what you are saying but I just have an odd feeling about this.the "receipt" is unlike anything Ive seen before and the figures dont mske sense. This is the fifth house we've done and never had an experience like this, albeit never done a bathroom but in the past had combi boilers fitted etc and always had receipts listing the price of the hardware eg boiler, sundries and labour and VAT. They are sending the electrician tomorrow afternoon re hot water wiring/timer. See what that brings, hopefully an end to the whole matter.
 
You’re more than entitled to ask for a receipt/invoice showing a breakdown of what YOU were charged, for labour, materials etc, whether you’re vat registered or not, you CAN ask for a vat receipt and once you request this, the company are legally bound to issue you with one (if they’re vat registered).

Been a while since I read the HMRC vat guidelines (been registered for over 20 years), but the usually stance was that for transactions under £100, there’s no need to issue an invoice with a breakdown of the vat, but if over £100, you MUST show the vat element on receipts/invoices.
 
If the work was within the budget agreed, or was based upon a specific specification, unless the customer has requested a broken down estimate or they have a specific contractual arrangement that specifies this, then they have no legal basis upon which to demand to see the original invoices for materials. The Contractor is obliged to deliver the contracted works at the agreed price and provided they have done this then they have discharged their responsibilities under the Contract.

Costs associated with additional works instructed will normally fall under the original terms of the Contract unless agreed differently - for example a customer could require a broken down invoice that included the price materials were being charged for but that would still not extend to what the Contractor has paid as it is not relevant to the Contract. The Contract requires only a specified amount against an agreed work package.

Depending on the nature of the invoicing system used by a Contractor there may be an entry for materials or similar (simply because it is how the system is written rather then being a requirement) but there will never be a line by line breakdown of materials/components - just think of how big the invoice would be for a house require ??

As you rightly point out retail suppliers can issue a simply VAT Invoice for items under ÂŁ250. Above ÂŁ250 and either a full VAT receipt or a modified VAT are required to be issued.

As far as I am aware there is no legal requirement for any receipt to be issued to a customer, but custom & practice is different.
 
If the work was within the budget agreed, or was based upon a specific specification, unless the customer has requested a broken down estimate or they have a specific contractual arrangement that specifies this, then they have no legal basis upon which to demand to see the original invoices for materials. The Contractor is obliged to deliver the contracted works at the agreed price and provided they have done this then they have discharged their responsibilities under the Contract.

Costs associated with additional works instructed will normally fall under the original terms of the Contract unless agreed differently - for example a customer could require a broken down invoice that included the price materials were being charged for but that would still not extend to what the Contractor has paid as it is not relevant to the Contract. The Contract requires only a specified amount against an agreed work package.

Depending on the nature of the invoicing system used by a Contractor there may be an entry for materials or similar (simply because it is how the system is written rather then being a requirement) but there will never be a line by line breakdown of materials/components - just think of how big the invoice would be for a house require ??

As you rightly point out retail suppliers can issue a simply VAT Invoice for items under ÂŁ250. Above ÂŁ250 and either a full VAT receipt or a modified VAT are required to be issued.

As far as I am aware there is no legal requirement for any receipt to be issued to a customer, but custom & practice is different.
Thanks guys. Im so confused now! My issues now are three fold. We were told to make "economical choices" to keep the cost down, so we didnt choose tiles etc that we might have done because we wanted to stay in ÂŁ4500 budget, however at the end we have been charged ÂŁ5800 anyway, so why did we have to be economical with our choices?!
Secondly the invoice hides this stating ÂŁ4700 + ÂŁ1100 for additional work's. Only the additional works are itemised and they are steep.
I have no issue paying 6k for a bathroom, what i have issue with is being told on original quote we wont need to do your soil stack/toich your electrics etc so they could quote at ÂŁ4500 only for them 2 days in to say we need to do all this work, right now or we will walk off the job.
No VAT!
Its dishonest and it felt bullying. I stayed out of my own home the whole of thursday as they were so bad. Theyve damaged carpet, a leather chair, had to repaint a freshly painted wall and so much dust never seen the like in 23 years of doing renovations.
Then the shower and hw tank to ice the cake.
Where would you go from here as ive had 3Ă— different views on the vat. I dont want money back, i want them to be fairer with customers in future.
 
Hi - Unfortunately it does often happen during renovation that things are discovered while the project is in progress. It's how this is handled that's remembered. I think you said your folks have not been together long. The important thing now is get the job completed to your satisfaction.
 
Hayley,

Just to set the scene I spent about 15 years managing large Contracts for work up to ÂŁ1bn so I am familiar with Contract Law. So to answer your questions and hopefully help you find a way forward here are some thoughts.

1 : What was your agreed price that you signed up to, and the scope of work that this price reflected?

2 : Prior to the extra work being identified, what (if anything) was agreed in respect of additional or emerging works ?

3 : Was there any agreement as to how additional work / materials, etc would be charged ?

4 : Was anything formally communicated to you about the price changes for the additional work ?

5 : Was the quotation issued with the phrase E&OE or does the "Errors & Omissions Excepted" or similar appear ?

6 : What level of site survey was undertaken ?

7 : In your opinion could a competent contractor have been aware of the potential risk or likelihood of additional work being necessary - agreed anything that might suggest the work would be more involved/complicated ?

8 : Read their Contract Ts & Cs and see what it says about additional works. There may be something that requires prior written authority before incurring cost which you could argue makes the extra costs non-recoverable but this is a thin straw to grasp and may not succeed

9 : What is the Contractual basis of the Contract (IEE or Standard Form, or ICE, etc. Should say in the Contract).

Once you have the answers to these questions then you can embark on the next stage which is to ask them to explain their price.

You should write to either the project manageress, or if not happy at that level, the Operations Manager, state that you are unhappy at quantum of the final cost and ask them for a detailed breakdown of the work they have undertaken, clearly setting out the original materials and labour costs you had authorised and setting out separately the additional labour and materials costs with a justification of how these figures have been arrived at.

As it appears you may well have instructed them to proceed with changes verbally, they will probably argue that it was undertaken on the basis of time and materials or emerging cost. Unless you can prove that either (1) the work was not necessary, or (2) they have undertaken work without your authority then you really do not have a good position in all of this.

You could if you so wish tell them that you had overheard an operative making the ÂŁ6000 statement but that is hearsay and would not necessarily be useful in any action. They may wish to speak with you and it may well be that they can demonstrate that they have acted fairly.

I fully appreciate all the pressures put upon you but were you to make a claim in Law then this will be looked at dispassionately and will purely proceed on the basis of Contractual Law.

If having obtained a detailed breakdown of the work you feel that the works have been overpriced then you could contact another reputable Company and ask them to give you a second opinion, or alternatively you could speak to your insurer and use the legal protection cover to arrange for an assessor to give you an opinion.

Finally there is a legal obligation on a Contractor to minimise the costs of additional work, in other words they have to act in a professional manner and cannot charge you excessively. There should also be some sort of trade association that can provide details of an ombudsman or an Arbitrator who could be contacted to give a binding opinion.

You should go this route in the first instance before resorting to a legal remedy.

I offer only an opinion above, and how you proceed is a decision for you but you should not proceed solely on the basis of my post here. I would strongly advise you to speak with a Solicitor with experience in Commercial Law at the earliest time if after you have asked them to justify their costs you still remain unhappy. You should give him the information I have suggested you collect above.
 
Hi. Thanks 4 detailed reply. They sent their electrician out tonight free of charge who restored and mended the hot water tank and issued certification and has filed part P so all is good. Took him 1hr. Why he couldnt do that Thurs/fri save all that aggro. All issues resolved now. Not pursuing them now as chance of refund non existant. Steep learning curve but at least the bathroom is quality. Thanks
 
So you will moan about and rubbish their work on this forum.......but not facebook......sent their sparky out for free......after charging you ÂŁ1300 more than the quote.....I wouldn't call that free
 
What is your point here? There were things wrong - missing/stolen shower, leaking sink, hotwater tank not restored, no paperwork Eic etc and what i felt was unfair charging system.
They have addressed all the issues. Apart from I do not have a VAT invoice.
I have a busy life and no energy to pursue something that i know i wont win. (I worked in legal 10 years.)
I was asking for advice re electricals. Got some very useful advice. Not moaning as far as I am aware, providing the facts as I saw them.
What would you want me to do now that would make you happy? You obviously feel I've done something wrong?
 
was told on initial survey we wont need to touch your electrics - was keeping original Mira Sport shower and spotlights.

Cant quite understand how it got from quote in your original post to involving electrical work? Unless Ive missed something in the thread.
As someone previously said, if no electrical work then nothing to 'pass'!
 
Because they wanted to make it into a bigger job. We can leave your existing spots and ceiling became our sparky says your spots are not safe so we need to change them, which then became we need to change your ceiling to accomodate the new spots. It looks lovely now but wasnt what we wanted and this only came about once theyd ripped out existing bathroom so then what can you do other than sack them off mid job. That then became you need a separate circuit for bathroom which led to you might as well get a fuse board done...etc
 
Because they wanted to make it into a bigger job.

THEY wanted to make it a bigger job?
Sounds like you were talked around too easily!
If the electrics didn't need to be touched (as you originally stated) there was nothing to turn into a bigger job or require certification/Notification!...…….. Think you've been mugged!
 

Reply to No paperwork following new bathroom installation in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
381
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
959
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
Part III:). I think I have clarity-having spoken to my electrician who installed my heaters, he said that the part of my fuseboard that is...
2 3 4
Replies
52
Views
2K
  • Question
Obviously not a building/DIY forum so will keep it short but yes - we've taken all the floors up. Several joists in the bathroom need doing as...
Replies
8
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top