A
Andy B
We quoted a job to rewire 2 bungalows. Did the job in the summer doing bits and pieces around other trades. They took forever to get plastering etc done. They changed there mind on the kitchen and stuff so many times. We moved the cooker switch and point for them twicw and basically bent over backwards keeping them happy. November came and we finally finished the job. They had paid about 2 thirds as we went along. They seemed to fall out with every trade on site and we thought we must just be more easy going. Before xmas we invoiced the final amount and they refused to pay coming out with crap excuses. They keep saying that people have told them the cables aren`t deep enough. I keep telling them that as long as the cables are in safe zones and RCD protected there is no minimum depth. Finally we sent them a letter threatening them with court action unless we recieve payment by today. They have just phoned me and they say they have called in trading standards and we will hear from them within a couple of day. I said I`m giving them to friday and registering it with small claims court.
They are the most infuriating people I`ve ever met.
They are the most infuriating people I`ve ever met.