when fitting a new off peak db for storage heaters. what is required by the suppliers to allow connection by them. this is on a tt system with a 17th edition db covering the on peak supply and an rcd db off peak .the last time i added an off peak supply was through a single rcd, 2 tier blocking the dbs leaving a loop on the live to the off peak db for connection through the suppliers timeclock all in 25mm tails.