old garage door | Page 2 | on ElectriciansForums

Discuss old garage door in the UK Electrical Forum area at ElectriciansForums.net

D

DDnot

Hi! I am doing an installation for a garage detached to a house. The garage is going to be converted within a few months into a living area. There are no water or gas services. Nothing really to bond apart from old metal garage door which will be removed during the conversion work anyway. There are no cables around the door or close to it. Do you think I should earth-bond the door temporarily? According to the regs I guess I should. What do you think? By the way the installation is completely separate from the main one through henley block and has a new consumer unit with RCD.
 
If it's a metal frame in contact with the general mass of earth, and as such is classed as an Extraneous conductive part, then why can't it be bonded pray tell? Additionally, not bonding it because "it was coming out at some point" would be no defense if someone were to get hurt in the meantime.
What the OP has not yet ascertained, it seems, is whether or not the framework is an ECP.
exactly...
 
Hi! I am doing an installation for a garage detached to a house. The garage is going to be converted within a few months into a living area. There are no water or gas services. Nothing really to bond apart from old metal garage door which will be removed during the conversion work anyway. There are no cables around the door or close to it. Do you think I should earth-bond the door temporarily? According to the regs I guess I should. What do you think? By the way the installation is completely separate from the main one through henley block and has a new consumer unit with RCD.

If it is being removed why would you want to bond it?

Another one who does not know what their doing after a 5 day course I think.
 
If it is being removed why would you want to bond it?

Another one who does not know what their doing after a 5 day course I think.

I don't think you can ever assume anything. If it does need bonding and the "conversion" was to take a year or 2, how would you make the decision not to bother? My philosophy is to bond anything that needs it, then remove it when it's no longer needed, although we still haven't established whether it even needs it yet, as the op seems to have lost interest !!!
 

Reply to old garage door in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
328
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
855
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
975

Similar threads

Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
1K
  • Question
Yes you will need to install # 4 wiring times 4 for your 2 hots, 1 neutral and 1 equipment ground. As for keeping the grounds and neutrals...
Replies
3
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top