When a open r1 conductor is observed on end to end measurements what is a suitable observation to note on the inspection schedule?
Would Co- ordination between conductor and overload device be included because the CCC has now been affected.
Thanks
Would Co- ordination between conductor and overload device be included because the CCC has now been affected.