View the thread, titled "Opinions required on work quality please." which is posted in Solar PV Forum | Solar Panels Forum on Electricians Forums.

I think as has been suggested the tiles couldn't be removed close to the ridge (or the edge) without disturbing the concrete settings. Oter than that the nibs should be ground off to allow the tile to sit down. it won't go completely flush but certainly better than these. Removing the nibs does not weaken the tile at all, although grinding the actual body of the tile may, especially if it's ground out as much as one of the previous photos to fit conduit through!

nothing wrong with that method !! it will be under panels etc so nobody will jump on it !!!
 
They're sending a team out on wednesday so hopefully it will get done properly this time, the Mrs. will be at home so she can savage them into action (she's scarier than me :grin:).
Thanks for all the input on this.
 
Well they sent out a different team and have done a much better job this time, still not perfect but the best that can be done with the bracket system, gaps much closer with leading edges filled with sealant to stop the wind getting under, flashing put back down much neater.
Fair play to them, thanks again for all the input.
 

Reply to the thread, titled "Opinions required on work quality please." which is posted in Solar PV Forum | Solar Panels Forum on Electricians Forums.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Daily, weekly or monthly email

Back
Top