A032701
-
just wondering what people would think would be the best way of doing this.
i have got to provide a supply up to a workshop in a garden (about 80 mtrs from the house). it will run underground all the way and then in the subfloor of the house that is currently being worked on all the way to the db.
i have got to provide a supply up to a workshop in a garden (about 80 mtrs from the house). it will run underground all the way and then in the subfloor of the house that is currently being worked on all the way to the db.