Driverman I was try to tell you 8 foot clearance but be like y’all and do it in meters and I can tell you I must have layed out of school that day because I don’t know the metric system and I don’t know y’alls clearances hell if I could go a day without Dave getting mad at me I wouldn’t know what to do anyway the clearances in the USA 8 feet
 
Driverman I was try to tell you 8 foot clearance but be like y’all and do it in meters and I can tell you I must have layed out of school that day because I don’t know the metric system and I don’t know y’alls clearances hell if I could go a day without Dave getting mad at me I wouldn’t know what to do anyway the clearances in the USA 8 feet
Hey, no worries
 
Your local PoCo and AHJ will give guidance on this matter.

If the AHJ inspector “red tags” the install you’re in for a rough ride.

This side of the pond we would refer to it as an improvement order. I’ve only seen one instance of an improvement order being issued, it wasn’t pleasant.

Remember, BS7671 is a code of practice, NFPA-NEC is statute law.
 
Your local PoCo and AHJ will give guidance on this matter.

If the AHJ inspector “red tags” the install you’re in for a rough ride.

This side of the pond we would refer to it as an improvement order. I’ve only seen one instance of an improvement order being issued, it wasn’t pleasant.

Remember, BS7671 is a code of practice, NFPA-NEC is statute law.
Carl that is so right in the USA, I just found out yesterday that an electrical company had done a job and still didn’t get the problem fixed so they called me and I found the problem in 15 minutes and it was an earthing problem. It burnt up there TV, refrigerator, microwave etc. they didn’t even draw a permit and changed a panel that wasn’t the problem and charged them $ 1100.00. I told the customer to call code enforcement and turn them in. Got a call from the customer yesterday and told me they found him guilty, fined him $ 1000 and suspended their license for 1 year. In America they don’t play if you don’t follow their guidelines and rules.
 
For those who don’t know, AHJ = Authority Having Jurisdiction = building control with teeth. Something we should have on this side of the pond. A red tag means the installation can’t be made live.
 
Steady on lads. :)
[automerge]1568121012[/automerge]
Carl that is so right in the USA, I just found out yesterday that an electrical company had done a job and still didn’t get the problem fixed so they called me and I found the problem in 15 minutes and it was an earthing problem. It burnt up there TV, refrigerator, microwave etc. they didn’t even draw a permit and changed a panel that wasn’t the problem and charged them $ 1100.00. I told the customer to call code enforcement and turn them in. Got a call from the customer yesterday and told me they found him guilty, fined him $ 1000 and suspended their license for 1 year. In America they don’t play if you don’t follow their guidelines and rules.
Did they get their money back too or not?
 
Last edited:
Steady on lads. :)
[automerge]1568121012[/automerge]

Did they get their money back too or not?
Dan no they didn’t get their Money back because the lady of the house canceled the check before they had a chance to cash it. I kind of felt bad about that company loosing their license for a year but follow the guidelines set by the NEC and NFPA and you will stay out of trouble.
 
Driverman I was try to tell you 8 foot clearance but be like y’all and do it in meters and I can tell you I must have layed out of school that day because I don’t know the metric system and I don’t know y’alls clearances hell if I could go a day without Dave getting mad at me I wouldn’t know what to do anyway the clearances in the USA 8 feet
we all think in feet and inches but have to work in metres/millimeters, (except the under 30's who don't know any better). it's better for you as everyone there uses feet and inches.
 

Reply to Overhead property supply clearance requirements in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
381
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
959
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Your kWh figures are giving you consumption averaged over each hour period, but don't give an indication of total instantaneous current. To try...
Replies
9
Views
1K
Given that a lot of EV's only charge from one phase when connected to a 3 phase chargepoint does the customer really need a 3 phase chargepoint...
Replies
1
Views
617

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top