Part 9 of the EIC | on ElectriciansForums

Discuss Part 9 of the EIC in the UK Electrical Forum area at ElectriciansForums.net

cliffed

-
Arms
Joined
Dec 20, 2009
Messages
2,183
Reaction score
697
Location
Worcester
What’s your take on the filling out of Part 9 Shedule of items tested on an EIC.
You’ve just fitted a DB in a large premises,you have only limited information on the electrical system.
The mains intake consists of a MPB, a MCCB, supplies this DB your replacing.
With limited details of the actual installation,bonding conductors etc would that Part 9,concern only the DB you are replacing.
 
No, all of the information is required. In larger commercial premises where it is often difficult to verify the information needed it is worth asking if a recent EICR is available. Usually one is and the required info can be copied from that with a few visual checks to verify nothing material has changed. If that is the case I always state on the EIC the source of information with the EICR number.
 
Cheers usual problems, finding the water, gas etc & getting into main switch room.
You get to the certification & all this is missing,I’m trying to get a better system in place,where we can get all the information in hand before.
 
Its a real headache trying to get all the information at the intake especially Ze when you cant switch anything off! And agreed locating bonding in large premises can be a nightmare.
Always wary of copying anything as i) You shouldn't ii) You are never sure it is correct in the first place!
 
Totally agree.. it’s a replacement of DB, there’s a. EIC going around somewhere, but not sent to us yet.
Also it would be ideal if you could actually enter a LIM, on the form.
Then the onus returns to the Client to speed up or the necessary documents.
 
Why is it that we electricians do everything,if a DB needs replacing in a large building with lots of DB’s,we then have to spend hours looking for the correct requirements on that installation.
I know it’s a possible way of losing the job but once again put the Onus on the Client,let them show us where the gas/ water etc are.
Pass drawings/Certs onto the sparky,that way it’s kinda a bit easier.
 
Some of our clients wouldn’t have a clue. Where they rent out the property and in some cases have never set foot on site!
Some of those renting are equally clueless, a young Thai girl in her nail bar springs to mind!
 
The amount of time I go into large commercial building and ask the where the main water stop tap ss and know one knows. I always suggest they should locate it incase there is a water leak and they need to turn the water off. Agree with cliff we always have to do a lot of free investigation work just to quote a job .
 
This is a good reason for using additional notes. If you need to, use them.
If details cannot be acquired should we pass on the job?
Did a one circuit job not long back, half a days work, in a massive hotel......absolutely no chance of getting the details. It's a case of testing as far as is possible and checking for safety, IMO, so why not a case of 'non accessible' or 'information unavailable'.
Loads of jobs in sports stadia and hotels where you can spend more time searching and asking for details than doing the job.
Access, test and certificate to the best of your ability, as the situation requires.

Obviously, domestic work is a different proposition altogether.
 
Last edited:
This is a good reason for using additional notes. If you need to, use them.
If details cannot be acquired should we pass on the job?
Did a one circuit job not long back, half a days work, in a massive hotel......absolutely no chance of getting the details. It's a case of testing as far as is possible and checking for safety, IMO, so why not a case of 'non accessible' or 'information unavailable'.
Loads of jobs in sports stadia and hotels where you can spend more time searching and asking for details than doing the job.
Access, test and certificate to the best of your ability, as the situation requires.

Obviously, domestic work is a different proposition altogether.
Spot on
 

Reply to Part 9 of the EIC in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
351
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
900
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top