Hi Forum
Struggling to get my head round interrupting the Building regulations
The building regulations 4(3) require that on completion of work in an existing building, the building should comply with the current building regulations, or if it did not comply before the work began, be no worse in terms of the level of compliance......
Would the addition of a new socket to an old installation be acceptable (the old installation is not compliant with current part P i.e. BS7671 17th A3 for example no RCD for sockets).
1, Would the installation now be worse in level of compliance?
2, I say worse in compliance as there is now the additional risk of a new socket, rather than i.e, the replacement of a socket?
Thanks
iain
Struggling to get my head round interrupting the Building regulations
The building regulations 4(3) require that on completion of work in an existing building, the building should comply with the current building regulations, or if it did not comply before the work began, be no worse in terms of the level of compliance......
Would the addition of a new socket to an old installation be acceptable (the old installation is not compliant with current part P i.e. BS7671 17th A3 for example no RCD for sockets).
1, Would the installation now be worse in level of compliance?
2, I say worse in compliance as there is now the additional risk of a new socket, rather than i.e, the replacement of a socket?
Thanks
iain