Im an electrician in a factory.
This morning a Labourer ran over a 32A 3 phase trailing socket with a genie!!
Then picks up the cable with now 5 cores sticking out and no socket, shouts Might need your help.
At which point I shout at him to put the cable down, as I may be still live, so he chucks it down on a metal work bench next to where people were working
The RCD had tripped either from original impact, or chucking it on the worktop!
I personally gave him a -------ing for this.
Then later on this afternoon, he had managed to drive over another 3 phase extension cable, with the HO7 caught up in the Genie wheel, he was there trying to pull it out whilst still live.
At this point I left it for management to give him a massive -------ing.
I checked the cable after, and the copper on L1 was showing and damaged!
Does anyone else work along with idiots like this?
This morning a Labourer ran over a 32A 3 phase trailing socket with a genie!!
Then picks up the cable with now 5 cores sticking out and no socket, shouts Might need your help.
At which point I shout at him to put the cable down, as I may be still live, so he chucks it down on a metal work bench next to where people were working
The RCD had tripped either from original impact, or chucking it on the worktop!
I personally gave him a -------ing for this.
Then later on this afternoon, he had managed to drive over another 3 phase extension cable, with the HO7 caught up in the Genie wheel, he was there trying to pull it out whilst still live.
At this point I left it for management to give him a massive -------ing.
I checked the cable after, and the copper on L1 was showing and damaged!
Does anyone else work along with idiots like this?