I have personally never seen or been aware of a "pass" sticker on CU. The ones i apply just state the date of last inspection, and the date of the recommended next inspection. I apply and complete them irrespective of the condition of the installation, as all i am doing is stating 2 facts..When i tested and inspected it, and when in my humble opinion i think it needs re doing based on the finding of the last PIR. The accompanying paperwork says the rest, and i keep a copy just in case anything arises later on.

Cheers..........Howard

Summed up perfectly ;)
 
Not being funny mate,but nowhere on the NIC pir does it say method of protection against indiect(sic) contact,DPN4.Although the DCN5 does ask for the same,although you have garnished us with few details,how old is the installation?
 
Interesting thoughts on the meaning of the PIR label. Accepting the way things are currently, as IQ says, it's a poor system. Is common thinking that the way is should be is that a PIR sticker is not applied until a satisfactory condition is reached? Contrast with the MOT. Can you imagine if you got given the MOT certificate and the mechanic said "the brakes are rubbish and the tyres are bald, but here's your certificate"? Or with the boiler service engineer. "Well there's a bit a gas leak but here's your certificate, you probably want to get it looked at".
 
Interesting thoughts on the meaning of the PIR label. Accepting the way things are currently, as IQ says, it's a poor system. Is common thinking that the way is should be is that a PIR sticker is not applied until a satisfactory condition is reached? ..

When I put one on, on the line 'Date Inspected', I put something like 'Tested circuit one, shower only'. *I think thats probably the best option, as anyone could believe the whole installation has been tested, as per this thread.

Alan.
 

Reply to Periodic Report Conundrum in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
301
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
814
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
873

Similar threads

  • Question
This potential client seems to be making progress in terms of being interested in proper chargers and answering my query questions. I have also...
Replies
13
Views
2K
  • Question
Nothing wrong with it. Which manufacturers have you got this information from? What do you mean by trip speed? Fuses and MCBs can operate in the...
Replies
11
Views
2K
davesparks
D

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top