It always for me depended on how many codes 1 + 2 you found. If the installation was so bad that it needed a rewire then I may not attach a sticker at all and inform the client in writing that IMO it was in need of rewire and therefore I would not recommend another inspection date as it pointless to re-inspect. You can also high light this on your PIR in the "next inspection" section
I have never done this to be fair, the shortest period I did was a 6 month one, for a commercial site, where I carried quite a bit of remedial work, once I had completed the work I replaced that sticker with a 5 year one, and then issued another PIR with the 5 yrs on it. This was recommended due to there being quite a lot of old MICC cable that were IMO starting to breakdown as they have fairly low IR readings.