hi guys
I am currently carrying a pir on a office building 5 yrs old
Tested all the circuits for r1-r2 zs rcd times ect but removed the insulation resistance tests as the building is full of it equipment (IT building}
Listed this as our limitations on the report can anyone advise on how the limitations should be worded
Inspected the Characteristics of primary supply overcurrent device. A Random Sample of Accessories Removed for Visual Inspection of Connections, Ie 20% of Lighting and Power Insulation Resistance Tests Have Been Omitted Due To Sensitivity of the Site, HVAC control cables. Testing of unverified circuits. Has Been Omitted From This Report
thanks in advance
I am currently carrying a pir on a office building 5 yrs old
Tested all the circuits for r1-r2 zs rcd times ect but removed the insulation resistance tests as the building is full of it equipment (IT building}
Listed this as our limitations on the report can anyone advise on how the limitations should be worded
Inspected the Characteristics of primary supply overcurrent device. A Random Sample of Accessories Removed for Visual Inspection of Connections, Ie 20% of Lighting and Power Insulation Resistance Tests Have Been Omitted Due To Sensitivity of the Site, HVAC control cables. Testing of unverified circuits. Has Been Omitted From This Report
thanks in advance