mrloy99
-
- Joined
- Dec 21, 2008
- Messages
- 473
- Reaction score
- 18
I've got a load of these to do and just wondering what y'all would recommend.Bathroom with pir sensor controlling light & timer fan(fan via isolator)I have been told that they don't
want pir on isolator?.MY preference would be to run lne to isolator first then 4core flex to pir then another 4 core flex from isolator to light then looping to fan.I personally would prefer to be able to switch off light from isolator for maintenance purposes as the dist board is 65m away....Just wondering how the rest of you would go about it?
want pir on isolator?.MY preference would be to run lne to isolator first then 4core flex to pir then another 4 core flex from isolator to light then looping to fan.I personally would prefer to be able to switch off light from isolator for maintenance purposes as the dist board is 65m away....Just wondering how the rest of you would go about it?