In my experience plasters aren't much for helping out other trades, some do most don't.
my plans are generally accurate to about 10mm, give or take, but I've previously wired DLs without board being there, allowed the muck raker in to do his job, and cut holes later, bingo Bango cables almost fell out of the holes.
also had one when I wired dozens of DLs in one room, only to walk off site as the tenant was uncooperative, like calling me out on an evening because they had messed with the electrics and ****ed it up, or not allowing me to return while the plaster was there but they weren't. Or just ****ing blaming me for issues caused by points that had been in situ for 20years, go figure!
anyway, they struggled to find a decent spark to finish the job, so plumped for a kitchen fitter/domestic installer, he called me 4months later and asked if I had a plan for the lighting,4 MONTHS! I was given 2 weeks to complete!
I gave him the plan like a muppet, but I didn't explain what all the different marks on the cables meant. That's the only job I've walked from