Discuss Points served on an niceic certificate in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net
On the schedule of test results on niceic cerificate where it says points served.Does a double socket mean 1 point or 2?
A point is where an accessory is connected. so it doesn't mater if single or double it's still only one point. Would you count a 2 gang switch as 2 points?
What about a 24 gang grid with multiple circuits connected in it ? Is that whole grid one point per connected circuit, or just one point for one of the circuits, or the total number of grid switches per circuit, or..... ?
On the schedule of test results on niceic cerificate where it says points served.Does a double socket mean 1 point or 2?
Tell us how many you think it is,
All the old things are returning, Cosmic circles ever turning.
-
Mentor
Arms
V.Nearly Esteemed
Does anyone put down number of points served 2 if a cooker control unit has a socket and supplies an outlet?
Might just be me
How many people actually bother filling this out? Its not in the forms in the BYB
Just saying
-
Mentor
Arms
V.Nearly Esteemed
How many people actually bother filling this out? Its not in the forms in the BYB
Just saying
My company is niceic so its required on the schedule as we use their model forms of certificate
My company is niceic so its required on the schedule as we use their model forms of certificate
It may be on the form but BS 7671 doesn't state its needed.
Another reg made up by the NICEIC
I'll bet he wished he didn't ask now!
Learning learner, still learning, please pass!
-
Mentor
Arms
V.Nearly Esteemed
It may be on the form but BS 7671 doesn't state its needed.
Another reg made up by the NICEIC
What can you do though?
They are very touchy if blank boxes are left on their certs.
What can you do though?
They are very touchy if blank boxes are left on their certs.
Not use their certs.....
-
Mentor
Arms
V.Nearly Esteemed
It's not my company so I use what I'm given by the boss.
It's not a hardship doing it
How many people actually bother filling this out? Its not in the forms in the BYB
Just saying
It is part of the information required by 514.9
Size and number of conductors, points served, type of wiring. That's why those items are inserted into most inspection schedules.
But no, I never list number of points personally.
What can you do though?
They are very touchy if blank boxes are left on their certs.
Don't leave them blank then .... put a line through them
Reply to Points served on an niceic certificate in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net
Wicked I've just actually looked through it and it's very smart. Some good stuff in it.
There's a tile association company that do a magazine...
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Hi everyone,
Another weekend, another sale!
Get ready for colder days with Haverland Radiators, combining efficiency with modern design. Keep...
Yea that makes sense. Even tho I’m not registered with niceic yet as still need to do the extra training. I’m still signing the qs part?
Thanks mate for the advice, this is just what I was looking for. I think I’ll have to put some thought into the domestic route due to the NVQ and...