K
Kiers1970
Hi lads, what do you reckon on these jobs pricewise, lost a few jobs recently, want to make sure I'm competitive, and not doing myself from the rear.
both kitchen jobs, ceiling should be ripped out on the downlighter job.. no floors to lift etc, cables routed through ceiling. Kitchens are a pain though, always have to go back,cna never complete whaen you want cos of the kitchen fitters etc.
both jobs notifieable etc.
> 1.Install approx 10no. Dual switched sockets/fused connection units for
new
> kitchen and in cupboard.
> 2.Relocate light switch position.
> 3.Install under cupboard lights, 4x low voltage fittings switched from new
> switch position.
> 4.Install over cupboard lighting,2x 2 ft flourescent fittings, switched
from
> new switch position.
> 5.Relocate PIR detector for intruder system.
> 6.Reconnect Main bonding to water and gas services.
> 7. Install cooker point for induction hob switch located in cupboard
> adjacent.
> 8. Relocate lighting point to desired central position.
>
> 1.Remove existing installation from kitchen area, make safe and
> reconnect.This should allow the kitchen to wired separate from the rest of
> the house.
> 2.Tidy wiring in cupboard understairs.
> 3.Remove existing consumer unit, replace with 10/12 way twin rcd consumer
> unit and mains tails/ Main earth conductors.
> 4.Install main bonding conductors to water and gas services.
> 5.Install approx 10no socket outlets/fused connection units for appliances
> and general use.
> 6.Relocate lightswitch position to agreed point at door entry.
> 7.Install 3no recessed down lights.
> 8.Install light point in porch and switch at door entry.
> 9.Relocate alarm wiring, supply and fit new PIR detector.
both jobs 30/40 mins drive,
first job seven ton, next just shy of a grand, cheap I think.
your thoughts appreciated
both kitchen jobs, ceiling should be ripped out on the downlighter job.. no floors to lift etc, cables routed through ceiling. Kitchens are a pain though, always have to go back,cna never complete whaen you want cos of the kitchen fitters etc.
both jobs notifieable etc.
> 1.Install approx 10no. Dual switched sockets/fused connection units for
new
> kitchen and in cupboard.
> 2.Relocate light switch position.
> 3.Install under cupboard lights, 4x low voltage fittings switched from new
> switch position.
> 4.Install over cupboard lighting,2x 2 ft flourescent fittings, switched
from
> new switch position.
> 5.Relocate PIR detector for intruder system.
> 6.Reconnect Main bonding to water and gas services.
> 7. Install cooker point for induction hob switch located in cupboard
> adjacent.
> 8. Relocate lighting point to desired central position.
>
> 1.Remove existing installation from kitchen area, make safe and
> reconnect.This should allow the kitchen to wired separate from the rest of
> the house.
> 2.Tidy wiring in cupboard understairs.
> 3.Remove existing consumer unit, replace with 10/12 way twin rcd consumer
> unit and mains tails/ Main earth conductors.
> 4.Install main bonding conductors to water and gas services.
> 5.Install approx 10no socket outlets/fused connection units for appliances
> and general use.
> 6.Relocate lightswitch position to agreed point at door entry.
> 7.Install 3no recessed down lights.
> 8.Install light point in porch and switch at door entry.
> 9.Relocate alarm wiring, supply and fit new PIR detector.
both jobs 30/40 mins drive,
first job seven ton, next just shy of a grand, cheap I think.
your thoughts appreciated