I'm pricing up a job so if anyone can help it would be much appreciated.
large commercial building, it has 18 x 8ft single fluorescent lights which what to be changed for 18 x 6ft twin fluorescents. as there phasing out 8 footers
im putting in a new c.u and the wiring is a total lash up as well. so it wont be a swap one and put a new one up job
and each switch does two flos at a time
what kind of rating would be adequate ie cable size and would and rcd as main switch trip due to earth leakage current for all 18 flos.
roughly £650 materials and labour £700?
I mainly do domestic but work is quite.
I'm pricing up a job so if anyone can help it would be much appreciated.
large commercial building, it has 18 x 8ft single fluorescent lights which what to be changed for 18 x 6ft twin fluorescents. as there phasing out 8 footers
im putting in a new c.u and the wiring is a total lash up as well. so it wont be a swap one and put a new one up job
and each switch does two flos at a time
what kind of rating would be adequate ie cable size and would and rcd as main switch trip due to earth leakage current for all 18 flos.
roughly £650 materials and labour £700?
I mainly do domestic but work is quite.