I'm pricing up a job so if anyone can help it would be much appreciated.
large commercial building, it has 18 x 8ft single fluorescent lights which what to be changed for 18 x 6ft twin fluorescents. as there phasing out 8 footers
im putting in a new c.u and the wiring is a total lash up as well. so it wont be a swap one and put a new one up job
and each switch does two flos at a time
what kind of rating would be adequate ie cable size and would and rcd as main switch trip due to earth leakage current for all 18 flos.
roughly ÂŁ650 materials and labour ÂŁ700?
I mainly do domestic but work is quite.
I'm pricing up a job so if anyone can help it would be much appreciated.
large commercial building, it has 18 x 8ft single fluorescent lights which what to be changed for 18 x 6ft twin fluorescents. as there phasing out 8 footers
im putting in a new c.u and the wiring is a total lash up as well. so it wont be a swap one and put a new one up job
and each switch does two flos at a time
what kind of rating would be adequate ie cable size and would and rcd as main switch trip due to earth leakage current for all 18 flos.
roughly ÂŁ650 materials and labour ÂŁ700?
I mainly do domestic but work is quite.