Hawk
The house in question has all carpets lifted so easy access for running cables. So here's what I've done and to do. Materials were ÂŁ500.
1. 17 spotlights wired and fitted.
2. 10 additional points in kitchen (sockets, fused spurs, cooker switch) walls chased, conduit installed and wired.
3. 10mm bonding to main water pipe. Approx. 25mtrs.
4. 15way dual rcd consumer unit fitted to replace two old fuse boxes.
5. Extend upstairs ring to include 3 extra sockets. (surface mounted)
6. Corrected landing light borrowed neutral. Was pretty handy to do.
7. All sockets and switches to be replaced throughout. (Approx. 20)
8. 4 new light fixtures to install. Already wired.
9. EIR
As I always seem to undercut myself, I'm hoping that you guys could give me an idea.
I've estimated 60hours to complete the job. Based in N.Ireland and the job is about 30 miles away
Cheers
1. 17 spotlights wired and fitted.
2. 10 additional points in kitchen (sockets, fused spurs, cooker switch) walls chased, conduit installed and wired.
3. 10mm bonding to main water pipe. Approx. 25mtrs.
4. 15way dual rcd consumer unit fitted to replace two old fuse boxes.
5. Extend upstairs ring to include 3 extra sockets. (surface mounted)
6. Corrected landing light borrowed neutral. Was pretty handy to do.
7. All sockets and switches to be replaced throughout. (Approx. 20)
8. 4 new light fixtures to install. Already wired.
9. EIR
As I always seem to undercut myself, I'm hoping that you guys could give me an idea.
I've estimated 60hours to complete the job. Based in N.Ireland and the job is about 30 miles away
Cheers