Ive been asked by a friend to look at a job which involves a new DB i think!
Its a garage with a 3-phase supply the DB is full.
They want a feed for a new ramp.
Im thinking can i tap off the DB(supply)and have a MCB in an enclosure as a possible out.
But overloading is a worry with DB been full. Im thinking if i clip the ampmeter round supply with everything on,and if ok with main switch and fuse i can do the above.
But i ain't too sure any guidence is welcome,cheers.
 
It depends on the readings you get from the load test, but if all is ok I think I would do the following. Divert the existing supply cables into a new main switch or switch fuse. On the secondary side you can either take the cables into a small bus bar chamber (expensive) or into some double deckers. From here you can install a new board and re-feed the old one. This also gets you over the regulation concerning one means of isolation for the whole system. This is also dependant on having enough space. Does the above make sense??
 
Ye cheers apart from im not sure what double deckers are? And Busbar chamber does sound expensive any ideas on the price?
 
Double deckers are those big black tail connector blocks. You get them with one common terminal or two, the latter being double deckers. Also known Henley blocks
 
Another way is to fit another DB next to the original.

Remove 3 circuits from the original DB and use these fuses to supply the new DB.

The 3 circuits you removed from the original DB can be installed in the new DB.
 

Reply to Problems what to do? in the Electrician Talk | All Countries area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
415
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
1K
I can't help wondering about earthing arrangements and how important aesthetics really are when attempting to make the best of a less than ideal...
2
Replies
21
Views
1K
nicebutdim
N

Search Electricans Forums by Tags

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top