Ive been asked by a friend to look at a job which involves a new DB i think!
Its a garage with a 3-phase supply the DB is full.
They want a feed for a new ramp.
Im thinking can i tap off the DB(supply)and have a MCB in an enclosure as a possible out.
But overloading is a worry with DB been full. Im thinking if i clip the ampmeter round supply with everything on,and if ok with main switch and fuse i can do the above.
But i ain't too sure any guidence is welcome,cheers.
Its a garage with a 3-phase supply the DB is full.
They want a feed for a new ramp.
Im thinking can i tap off the DB(supply)and have a MCB in an enclosure as a possible out.
But overloading is a worry with DB been full. Im thinking if i clip the ampmeter round supply with everything on,and if ok with main switch and fuse i can do the above.
But i ain't too sure any guidence is welcome,cheers.