I'm currently refitting a pv system which was removed while building work was carried out. I didn't remove the system myself so don't know how it was wired before. The issue I have is that the generation meter has terminations suitable for upto 25mm tails. The AC supply to this is in 4mm twin/earth. I can't wire the twin/earth straight into the meter as it will leave the large connections on the meter too exposed. Also, it will not be suitable to run tails from the meter into the AC isolator.
Can anyone help with suggestions as to how this is usually done please?