QS and electrical Installation certificates | Page 2 | on ElectriciansForums

Discuss QS and electrical Installation certificates in the UK Electrical Forum area at ElectriciansForums.net

Pete999

-
Arms
Joined
Mar 14, 2013
Messages
25,946
Reaction score
17,089
Location
Northampton
Here's a first, I have a question regarding Domestic 3 signature EICs, not having much to do with Domestic for a very long time way before the onset of the introduction of the QS, as I understand it the 3 signatures required are: the Installation designer, the Installer and the QS, before the QS actually signs off the cert, does He/She have to carry out any testing? or is it just a case of checking the cert to ensure it has been filled out correctly?
 
The only reason that they managed to keep in the scheme was they could see that I was trying. In the end it all came back to bit him.
Just goes to show that you can be a lone cowboy and get away with it or you can be a posse of cowboys and still get away with it, about time the CPS took a good look at themselves and got their act together, imo
 
Can I take this thread a different way slightly for a minute, but based on a theme that has already been mentioned in brief. The model forms state they are for installations up to 100A - in the work I've been involved in this has been sufficient but what forms are used for bigger installs? Has anyone got a 100A+ model form, and where would they typically be used?

Thanks
 
So in effect if what you are saying is the norm, the QS is the fall guy should the brown stuff hits the fan?
This is where the good habit of getting everything in black and white and storing it for future reference comes into play.

Also going around and auditing sites during works and on completion not only ensures the work is being done correctly but also enables me to identify the less conscientious employees and apply a little more pressure on them to get the job done correctly.

My arse is covered if anything does go wrong. It pays to be proactive and be forceful with the management. It does take a lot of hard work to keep on top of things, good job I don't really care about upsetting management... ;)
 
Good for him
Can I take this thread a different way slightly for a minute, but based on a theme that has already been mentioned in brief. The model forms state they are for installations up to 100A - in the work I've been involved in this has been sufficient but what forms are used for bigger installs? Has anyone got a 100A+ model form, and where would they typically be used?

Thanks
just use the standard electrical installation certificate.
The single phase 100amp ones are just less pages for the full scope single phase brings.
 
This is where the good habit of getting everything in black and white and storing it for future reference comes into play.

Also going around and auditing sites during works and on completion not only ensures the work is being done correctly but also enables me to identify the less conscientious employees and apply a little more pressure on them to get the job done correctly.

My arse is covered if anything does go wrong. It pays to be proactive and be forceful with the management. It does take a lot of hard work to keep on top of things, good job I don't really care about upsetting management... ;)
A valid point Strima, problem is that there are some unscrupulous managers out there, "toe the line or look for another job" and jobs are few and far between these days. You might say not these days employment protection and all that, that' OK if you work for a large employer who doesn't want an unfair dismissal tribunal hanging over them, but believe me if you rock the boat there are ways of getting rid of a, shall we say trouble maker.
 
just use the standard electrical installation certificate.
The single phase 100amp ones are just less pages for the full scope single phase brings.

You mean this one? That states it's only for use up to 100A?

[ElectriciansForums.net] QS and electrical Installation certificates
 

Reply to QS and electrical Installation certificates in the UK Electrical Forum area at ElectriciansForums.net

Similar threads

It applies to commercial if it shares the same supply as a dwelling.
Replies
4
Views
499
I usually put something like this To assess compliance with BS7671 for continued safe operation (5 year periodical inspection)
Replies
8
Views
406

Recommended Sponsor News

Quickwire Now Sponsor ElectriciansForums.net

I am sure you will join me in welcoming our newest sponsors of ElectriciansForums.net - Quickwire! They have decided to join us after seeing you guys discussing their products here. Now we have an expert on board that you can chat to @Quickwire-Sam who will be happy to answer your queries!

[ElectriciansForums.net] Quickwire Now Sponsor ElectriciansForums.net


@Quickwire-Sam said "At Quickwire, we're all about speed, safety, and reliability. We're a family-run business, and every Quickwire connector is proudly made right here in the UK, ensuring noticeable quality. In short, Quickwire is the fastest connection method on the market. Whether you're an experienced electrician or a DIY enthusiast, Quickwire makes electrical connections ridiculously quick and easy. We're passionate about blending British craftsmanship with innovation. If you have any questions or if there's any way we can help, please just ask me!"

Exclusive Forum Offer! Free euro 2024 wall chart for first 10 responses!

Hi everyone,

We have 10 exclusive Uheat EURO 2024 Wallcharts to giveaway for Electricians Forum Members! The first 10 people to reply YES to this thread - I will message and get them sent out to you just in time for this years tournament! GO GO GO

PCBWay Now Sponsor ElectriciansForums.net!!

I hope you will all join me in welcoming our newest sponsor to the forum PCBWay! You can contact their friendly people by sending a message to @PCBWay who will be happy to answer your queries.

Welcome to the community and thanks for your sponsorship!

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

PCBWay provides services including PCB Prototype and batch Production, PCB Assembly (SMT), 3D Printing, CNC Machining, PCB Design, Electronics Modules Selling, etc. We are committed to meeting the needs of global makers from different industries in terms of quality, delivery, cost-effectiveness, and any other demanding requests in electronics.

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top