Qualifications needed to register with Napit as EICR electrician | Page 3 | on ElectriciansForums

Discuss Qualifications needed to register with Napit as EICR electrician in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

Installed around 15-20 LEDs in 4 hours. My First attempt took 15 minutes :confused:. After third led, learnt the right technique. Top electrian, down to earth type of fella. First thing he done was show me what he had done, half of which I did not understand :eek: lol.

Opened my eyes a little. So much more to electrical than i envisaged. Elderly couple seem to be splashing out on a new kitchen. They somehow managed to unearth a cellar which was full of rubble. All emptied now ready for wine.

Time to recouperate, 8am start. Need to collect more LEDs from wholesaler.
 
Installed around 15-20 LEDs in 4 hours. My First attempt took 15 minutes :confused:. After third led, learnt the right technique. Top electrian, down to earth type of fella. First thing he done was show me what he had done, half of which I did not understand :eek: lol.

Opened my eyes a little. So much more to electrical than i envisaged. Elderly couple seem to be splashing out on a new kitchen. They somehow managed to unearth a cellar which was full of rubble. All emptied now ready for wine.

Time to recouperate, 8am start tomorrow. Also n need to collect more LEDs from wholesaler before heading on site.
 
Glad to hear it went well and hopefully will continue to do so, well done we get so many threads on I can’t find work or no one will give me a chance when those threads come up we can now put a link to this thread for inspiration for those who think there is no hope so once again well done
 
Installed around 15-20 LEDs in 4 hours. My First attempt took 15 minutes :confused:. After third led, learnt the right technique. Top electrian, down to earth type of fella. First thing he done was show me what he had done, half of which I did not understand :eek: lol.

Fair do's.....keep learning.
Nearly 20 led fittings in four hours first time out, eh?
You'll be throwing a 15 way CU in within ten minutes next week...;)
 
Hi, I need some advice which course I should sign up for? I want to sign up with Napit as EICR qualified electrician.

I want to eventually be able to sign my own work off, complete condition reports, minor work cert. - all domestic side work.

Current qualifications 2330 level 2+3 and 17 edition which I need to recap on as it's been some time since I done course.

Appreciated if anyone can give advice by tomorrow. I'm going to sign up by tomorrow and place deposit down with able skills.

After course I plan on purchasing my own van and starting my own business as I don't seem to be receiving any help from electricians willing to take me on even for free labour so best to start up on my own.

Any help appreciated. Ty
Deleted
 
Fair do's.....keep learning.
Nearly 20 led fittings in four hours first time out, eh?
You'll be throwing a 15 way CU in within ten minutes next week...;)

Well the builder insisted I had to Devour a donut.... Rude not to on your first day. So time went thereHopefully I'll speed up soon with more experience.

Need to toughen up, finger tips hurting terminating cable.

Mustn't forget, congratulations on your award for 'top poster of month'. You must be delighted.
 
Well the builder insisted I had to Devour a donut.... Rude not to on your first day. So time went thereHopefully I'll speed up soon with more experience.

Need to toughen up, finger tips hurting terminating cable.


Mustn't forget, congratulations on your award for 'top poster of month'. You must be delighted.
No not really Mate, don't take much notice of it to be honest, here's one more to add to my score.
 
Never done much tbh. Second fix so all cables were looped down ready to terminate.

I thought I was going slow. Boss has been on the tools since he left school, now 32, took him 2/3 minutes at most.

I'll get there one day :D

I reckon the shoddy job I'm tidying up at the mo probably took them a few minutes per light to terminate, and it's BAD!

Once you get going on a repetitive task you'll soon pick up speed, but speed isn't everything.
 
This job is far better than sitting at my desk withering away getting fat.

Today completed 3 LEDs, outdoor socket, 5 ring sockets, few light switches - which I need to relearn, light fitting installed, two door bells installed + doorbell chime- chased out using sds/skutch chisel and few other small jobs.

Not bad a for a fat bloke :D 9am start tomorrow
 

Reply to Qualifications needed to register with Napit as EICR electrician in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
706
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

Similar threads

The goal posts have moved several times so I'd suggest phoning both of the main schemes and asking them. I've always found Napit and NICEIC...
Replies
1
Views
218
Concerning isn't it. I fear it's just going to lead to reduction in standards and entry requirements and flood the industry with even more poor...
Replies
11
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top