S
Staffie
Just give me a rough quote for this job!
It's on a dairy farm 7 mile from home. I've done a few jobs already, I gave him my quote and he was pretty shocked at my price and thought it seemed expensive? I thought I was pretty cheap, and could quite happily stuck another 200 quid on it!
Let's see who gets the job. I'll post my price a little later on...
Materials;
1x400w hqi flood
1x250hqi flood
2x400w high bay son-e (second-hand crompton's)
1x70w twin anti corrosive hf batten fitting
50m of 2.5 3 core sy
50m of 2.5 3 core swa
1x resin joint kit
1x masterseal light switch
2 bags of cleats
M10 nuts, bolts, anchor eye bolts etc
Labour;
* High bays will be hung on chain, 5m up in a barn, cable run to last fitting about 30m
* 400w hqi on front of barn at the apex about 6m up, cable run about 10m
* 250w hqi at rear of barn at the apex about 6m up, cable run around 30m
* Floodlights will be fixed by drilling into 5mm steel trusses
* remove old batten fitting and replace with new twin, and re cable, cable run from switch about 7m
* joint existing swa for 400w hqi with around 7m of cable, already connected to existing switch
* Remove old 500w TH fitting, already connected to switch, this circuit will be used for the son's but new cable used and run about 30m
This job requires a cherry picker which I have access to (free of charge to me) ex e-on landie
It's on a dairy farm 7 mile from home. I've done a few jobs already, I gave him my quote and he was pretty shocked at my price and thought it seemed expensive? I thought I was pretty cheap, and could quite happily stuck another 200 quid on it!
Let's see who gets the job. I'll post my price a little later on...
Materials;
1x400w hqi flood
1x250hqi flood
2x400w high bay son-e (second-hand crompton's)
1x70w twin anti corrosive hf batten fitting
50m of 2.5 3 core sy
50m of 2.5 3 core swa
1x resin joint kit
1x masterseal light switch
2 bags of cleats
M10 nuts, bolts, anchor eye bolts etc
Labour;
* High bays will be hung on chain, 5m up in a barn, cable run to last fitting about 30m
* 400w hqi on front of barn at the apex about 6m up, cable run about 10m
* 250w hqi at rear of barn at the apex about 6m up, cable run around 30m
* Floodlights will be fixed by drilling into 5mm steel trusses
* remove old batten fitting and replace with new twin, and re cable, cable run from switch about 7m
* joint existing swa for 400w hqi with around 7m of cable, already connected to existing switch
* Remove old 500w TH fitting, already connected to switch, this circuit will be used for the son's but new cable used and run about 30m
This job requires a cherry picker which I have access to (free of charge to me) ex e-on landie
Last edited by a moderator: