Hi,
Just a few questions as I rarely do any domestic work.
I'll be changing a few single sockets to doubles and also adding a few extras on the existing ring. Currently has no RCD protection and common sense suggest that because I'll be adding sockets I should add RCD protection?
Downlights will also be removed and replaced with standard pendants and switch plates changed back to white. Although cables will probably be <50mm in walls I'm doing "maintenance" and as such no need to RCD circuit?
Would my thinking on these two points be correct, none of the work is notifiable but I wish to stay the right side of the regs if possible.
Just a few questions as I rarely do any domestic work.
I'll be changing a few single sockets to doubles and also adding a few extras on the existing ring. Currently has no RCD protection and common sense suggest that because I'll be adding sockets I should add RCD protection?
Downlights will also be removed and replaced with standard pendants and switch plates changed back to white. Although cables will probably be <50mm in walls I'm doing "maintenance" and as such no need to RCD circuit?
Would my thinking on these two points be correct, none of the work is notifiable but I wish to stay the right side of the regs if possible.