Haha!!... I don't normally ''Hint'' about anything!!... Well so i've been told ...lol!!
 
I suggest you read the original OPs post, No where in that post, did it talk about granny flats, annexes, or flats, You did that!! I read the post as it was described, and i related to it, and that was as ....'A House Extension'' .

Now unless we are talking about a rather large sprawling house, there will never be a need for having 2 CUs in remote separate locations. 2 CUs Yes maybe, ...one for off peak heating tariff's, or as a means of increasing the number of circuits. But again both located at a common position.


So let me say this again, albeit a little modified to suit yourself, ''The use of 2 remotely separated CUs in a standard sized single dwelling house is a nonsense!!!'' And that is not misleading, nor is it wrong!!!
Your original posts at the start of this thread(before there was any notion of the extent of the extended property,or it's intended use) inferred that a second remote DB in a single dwelling is never acceptable and even a cowboy practice....that is absolute rubbish and it is that I took issue with.There are instances where a separate DB would be a better installation method than running multiple final circuits a long distance to a main DB,some of those instances have already been acknowledged,others come to mind.
In the part of your quote highlighted you have suddenly inserted "standard sized"....where was this when your original posts were stating that a second CU is never acceptable?.....you were as unaware as I was of all the facts,that is why my first post asked for more info before answers could be given....
 
Your original posts at the start of this thread(before there was any notion of the extent of the extended property,or it's intended use) inferred that a second remote DB in a single dwelling is never acceptable and even a cowboy practice....that is absolute rubbish and it is that I took issue with.There are instances where a separate DB would be a better installation method than running multiple final circuits a long distance to a main DB,some of those instances have already been acknowledged,others come to mind.
In the part of your quote highlighted you have suddenly inserted "standard sized"....where was this when your original posts were stating that a second CU is never acceptable?.....you were as unaware as I was of all the facts,that is why my first post asked for more info before answers could be given....


It's pointless going on and on about this, i think it's been thrashed out enough now....
All i as trying to point out in my last post was that i always understood, that the OPs original post was an extension and nothing more, and that is what i commented on, in my original post.
I didn't suddenly insert ''Standard'', ... as i stated that was to satisfy your side of the argument.
 
The 16mm in question is a 30m run straight through joists 400m apart .SWA would have been a bit of a chew.
I can't see the problem,if its labeled up,how the distribution layout should be a concern.
Anyway if I change the CU for a dual RCD board and come from a way that's 80a 30ms protected and feed my new board that has 5 circuits,how do I allow for division of circuits at my new board?
For those who are thinking lack of competence,would I be ***** to sit here on a saturday night fishing for the answer with a missus pestering for some romance............?
 
Last edited by a moderator:
The 16mm in question is a 30m run straight through joists 400m apart .SWA would have been a bit of a chew.
I can't see the problem,if its labeled up,how the distribution layout should be a concern.
Anyway if I change the CU for a dual RCD board and come from a way that's 80a 30ms protected and feed my new board that has 5 circuits,how do I allow for division of circuits at my new board?
For those who are thinking lack of competence,would I be ***** to sit here on a saturday night fishing for the answer with a missus pestering for some romance............?

Why are you here if you have the option of the jump??

U mad??
 
Last edited by a moderator:
She's just made me watch the ****est film i have ever seen.....Valentines Day!
Obviously, it's now time for some punishment............:p
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
RCD splitting question
Prefix
N/A
Forum
Electrical Wiring, Theories and Regulations
Start date
Last reply date
Replies
47

Advert

Thread statistics

Created
piggyitm,
Last reply from
piggyitm,
Replies
47
Views
6,634

Advert

Back
Top