Hi all,
I have been to a job today to have a look. The customer is moving some stud walls in a ground floor flat and wants me to move the electrics within them and fix them temporary while other walls are built. My only concern is the meter box is outside and the 25mm tails and 16mm cpc are fed from a 100dp switch next to meter, about 10 metres to consumer unit all surface fixed in 50x50 trunking along the top of one of these stud walls. Customer wants to chase these cables in now, so do these require rcd protection?
many thanks
I have been to a job today to have a look. The customer is moving some stud walls in a ground floor flat and wants me to move the electrics within them and fix them temporary while other walls are built. My only concern is the meter box is outside and the 25mm tails and 16mm cpc are fed from a 100dp switch next to meter, about 10 metres to consumer unit all surface fixed in 50x50 trunking along the top of one of these stud walls. Customer wants to chase these cables in now, so do these require rcd protection?
many thanks