Got a renovation to do on a ground floor flat which has been empty for a long time. The rest of the building has been renovated, pretty poorly on the electrical side! The current set up is a 16mm twin to the upper flat and a 16mm split con to the mid flat. The three phase cutout is currently in the porch of the ground floor flat so needs moving. Where do I stand on reconnecting these supplies? I'm pretty sure the cables aren't >50mm and there's no protection currently in place. Pme earth and only the top floor flat is connected through a switch fuse (100amp fuse). Cheers in advance.
 
If I read correctly, why do you need to move the existing 3 Phase supply in the porch? I'm assuming that all 3 tenants would have access to the porch area in case of any electrical problems.

If 3 phase has to be moved.....contact your local DNO.......cost though!
 
Got a renovation to do on a ground floor flat which has been empty for a long time. The rest of the building has been renovated, pretty poorly on the electrical side! The current set up is a 16mm twin to the upper flat and a 16mm split con to the mid flat. The three phase cutout is currently in the porch of the ground floor flat so needs moving. Where do I stand on reconnecting these supplies? I'm pretty sure the cables aren't >50mm and there's no protection currently in place. Pme earth and only the top floor flat is connected through a switch fuse (100amp fuse). Cheers in advance.

16MM split con,??????
 
The 3 phase cut out has been fitted in the ground floor flat porch as it was not in use and was an easy option for sse as one owner owned the whole building. The flats have now been sold off so the position is not viable to stay there. SSE propose to move the cut out up one floor to a shared porch (shared by the mid and upper flats) and fit a single phase cut out in the lower flat. I need to know whether I can reconnect the 16mm split concentric and the 16mm twin or wether I would need to rewire with an armour, which I would prefer to do. It wouldn't be easy but the previous owner is footing the bill for the work involved in the split. Hope this makes a bit more sense??
 
[QnUOTE=Dillb;1091004]Wat tests have you carried out on the cables that are currently instslled?[/QUOTE]
None. The I just went to look at the job. The problem is that I'll need to fit switchfuses after the individual meters, where do I stand on reconnecting these existing sub mains. Obviously I'm not gonna fit an rcd and the cables run through the fabric of the buildings so will require protection.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
scotland
Website
http://www.westech-electrical.co.uk
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Practising Electrician (Qualified - Domestic or Commercial etc)

Thread Information

Title
Reconnection of sub main
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
9
Unsolved
--

Advert

Thread statistics

Created
Carlosfandango,
Last reply from
Carlosfandango,
Replies
9
Views
1,021

Advert

Back
Top