Redoing rubbish work | Page 2 | on ElectriciansForums

Discuss Redoing rubbish work in the UK Electrical Forum area at ElectriciansForums.net

magnoliafan89

-
Arms
Joined
Feb 12, 2017
Messages
433
Reaction score
636
Location
Hereford
Got to a job today only to find out as well as a test I needed to do some remedial works to the board as the company we had subcontracting to us had made a state of it.
Have come across a few of their bits of handy work, they say a plastic board is a c2 and then change it and management were happy as it was dead cheap...neglecting the logic that if it didn't need changing anything over ÂŁ0 was infact NOT cheap.

Now I'm not saying mine is spectacular but for a short notice job I was quite satisfied.

So here's before.......
 

Attachments

  • [ElectriciansForums.net] Redoing rubbish work
    Screenshot_20210310-143621_Gallery.jpg
    67.4 KB · Views: 130
  • [ElectriciansForums.net] Redoing rubbish work
    Screenshot_20210310-143630_Gallery.jpg
    71.6 KB · Views: 128
  • [ElectriciansForums.net] Redoing rubbish work
    20210310_091616.jpg
    403.1 KB · Views: 132
  • [ElectriciansForums.net] Redoing rubbish work
    20210310_092544.jpg
    480.5 KB · Views: 134
Never seen it in the centre before either, it's usually on the right

Yeah, I just wondered if there's any reason why it couldn't be relocated, obviously providing everything is connected correctly? Would this be considered a deviation from manufacturers specification or contravene any regulation within BS7671?
 
You'd have to get the busbar past the main switch neutral terminal or connect your tails opposite to the L & N markings on the main switch, so that would certainly be a deviation, or in plain English a lash up.
 
You'd have to get the busbar past the main switch neutral terminal or connect your tails opposite to the L & N markings on the main switch, so that would certainly be a deviation, or in plain English a lash up.

Both old and new CU in OP's images make such a deviation. I'm just curious to know if there's anything that specifically prohibits this?
 
On original pic I can see what looks like a 16mm earth disconnected, below rhs of earth bar, presumably the Main Earth to MET
Was it like that when you arrived at the job?
 
And after

And I know I know I have the main switch on with the cover off...but had to make my pictures purdy with lighting
Not all cables exactly straight at 90degrees. C2 and redo asap.
 
Demonstrates the stupidity of the bean counter placing the order for the work IMO at that price, no doubt the cost of the corrective work is hidden somewhere else
God knows what they put into their price. But for our company they paid ÂŁ80 to the subby to do a board change unnecessarily(as the subby classes plastic CUs as C2) then paid for me to have to test it and then go do the remdials when I hand an unsatisfactory report in.
 

Reply to Redoing rubbish work in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
437
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top