Hi there, I'm needing some guidance in how to interpret this reference method.
How could one be sure that the installed cable behind the plasterboard ( in my case) is actually touching the inner wall ie the plasterboard?
I'm going to have a 25mm service void on my insulated stud wall, but I'm thinking once the plasterboard is fitted it may touch the cable now and then but not consistently, so do I use method 103 but i would need to wire my ring in 6mm cable and that's not going to happen lol.
Can anybody please help and give there thoughts on this?
Thanks.
Gary.
How could one be sure that the installed cable behind the plasterboard ( in my case) is actually touching the inner wall ie the plasterboard?
I'm going to have a 25mm service void on my insulated stud wall, but I'm thinking once the plasterboard is fitted it may touch the cable now and then but not consistently, so do I use method 103 but i would need to wire my ring in 6mm cable and that's not going to happen lol.
Can anybody please help and give there thoughts on this?
Thanks.
Gary.