These are on the of the refurbished areas we are doing. The building unfortunately for us is occupied so it makes the job a bit challenging. Picture below is the main trunking that will run down the central corridor it is a wierd size, it equates to a 6 x 2. This is for small power and lighting.
Next to the trunking is the lighting conduit. Again we do it slightly different over here we drop down in Ally flexible as you can see.
Below is inside one of the rooms. Just to show the trunking continuing and again we come out of the trunking in Ally conduit and then connect back into ridgid via a pull box. At first never liked this way, but I have to admit it does give you flexibility
Bellow is one of the rooms, that is nearly finished. This will not have a false ceiling. It shows how we fit the lights to the concrete slab. They are actually hung of 6mm threaded rod and we slide the conduit over them. Again over here they are not hung via hooks and chains, and again I quite like this way of doing it, far safer in my mind
Next to the trunking is the lighting conduit. Again we do it slightly different over here we drop down in Ally flexible as you can see.
Below is inside one of the rooms. Just to show the trunking continuing and again we come out of the trunking in Ally conduit and then connect back into ridgid via a pull box. At first never liked this way, but I have to admit it does give you flexibility
Bellow is one of the rooms, that is nearly finished. This will not have a false ceiling. It shows how we fit the lights to the concrete slab. They are actually hung of 6mm threaded rod and we slide the conduit over them. Again over here they are not hung via hooks and chains, and again I quite like this way of doing it, far safer in my mind