Hi all,

in the statement of works I have from my electrician, it says:
"Re-instatement of damaged areas: all areas of the house where it is necessary to cut wall chases and sink boxes etc will be restored to a condition suitable for redecoration."

I did not thoroughly define what this means prior to the work starting, and we are now approaching the end.

I wanted to find out what condition would you all believe to be a reasonable way to leave the damaged areas to capture the spirit of that quote? Bonding plaster only, or finishing plaster? If he just leaves bonding plaster, should I push for finishing plaster? I can't decorate directly on top of bonding plaster, would need finishing plaster or filler first, so my thinking was that it should be up to a paintable standard, but I might be expecting too much.

many thanks!
 
Last edited:
Hi all,

in the statement of works I have from my electrician, it says:
"Re-instatement of damaged areas: all areas of the house where it is necessary to cut wall chases and sink boxes etc will be restored to a condition suitable for redecoration."

I did not thoroughly define what this means prior to the work starting, and we are now approaching the end.

I wanted to find out what condition would you all believe to be a reasonable way to leave the damaged areas to capture the spirit of that quote? Bonding plaster only, or finishing plaster? If he just leaves bonding plaster, should I push for finishing plaster? I can't decorate directly on top of bonding plaster, would need finishing plaster or filler first, so my thinking was that it should be up to a paintable standard, but I might be expecting too much.

many thanks!
If that’s his wording in the quotation he should have it smooth enough to be painted over.

Usually I fill the holes with bonding, they one coat of finishing, and I tell the client they should organise their own painter/ decorator to give it a once over if they want it perfect.
 
Please can you post some pics up of what the finish is now.
 
Please can you post some pics up of what the finish is now.
Thanks all, here's a pic that's a good example of how the finishing looks of the rough bonding plaster. Chasing and box surroundings are all similar to that level of finish.

If you include make good, what would you do regarding the holes left by old back-boxes? That is, where you move sockets (e.g. bringing up to 450mm from floor), would you remove the old back box and fill the hole with plaster, or does that not come under making good? Technically nothing damaged there so I can see that it wouldn't be covered.
[ElectriciansForums.net] Reinstating / making good
 
Thanks all, here's a pic that's a good example of how the finishing looks of the rough bonding plaster. Chasing and box surroundings are all similar to that level of finish.

If you include make good, what would you do regarding the holes left by old back-boxes? That is, where you move sockets (e.g. bringing up to 450mm from floor), would you remove the old back box and fill the hole with plaster, or does that not come under making good? Technically nothing damaged there so I can see that it wouldn't be covered.
View attachment 40505
Is he coming back to finish that mess off?
 
Thanks all, here's a pic that's a good example of how the finishing looks of the rough bonding plaster. Chasing and box surroundings are all similar to that level of finish.

If you include make good, what would you do regarding the holes left by old back-boxes? That is, where you move sockets (e.g. bringing up to 450mm from floor), would you remove the old back box and fill the hole with plaster, or does that not come under making good? Technically nothing damaged there so I can see that it wouldn't be covered.
looks like he but that on with a butter knife ,why did you not get a plasterer in for the chases ,or was the price to good ?
 
To be fair, if that can be covered up by a good plasterer or decorator, then its better than trying to leave a flush finish, that will look a complete mess when painted over.

My T&C's state that all chases etc, will be under filled by 2mm, to allow for final finish, which is not included in the quotation. However, I can give you the number of a good plasterer and/or decorator.
 

Reply to Reinstating / making good in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
438
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
Hi I'm again struggling with a long overdue 2396 project but, as before, am at a standstill when it comes to the lighting design. Please could...
Replies
0
Views
687

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top