T
TPES
I have a customer who has had a porch extension, this meaning his electric meter is being moved and wants his consumer unit relocating, also meaning all circuits will be extended and run above new ceiling to the new location, I have told him that all circuits will require RCD protection which may mean a new consumer unit.
He sent me a photo of his current C.U and asked if this would be ok to use still
What do you think
He asked if the One circuit on the main switch can just be moved to the RCD side
He sent me a photo of his current C.U and asked if this would be ok to use still
What do you think
He asked if the One circuit on the main switch can just be moved to the RCD side