Or use a 230V no/nc relay next to the joint box to provide the HW on/off commands, feeding the coil from the existing HW "on" wire.
Or use a 230V no/nc relay next to the joint box to provide the HW on/off commands, feeding the coil from the existing HW "on" wire.
chances are there wont be a permanent live in the joint box
Good point, if the programmer is near the boiler there probably won't be a permanent live at the jb.chances are there wont be a permanent live in the joint box