Hi I'm just starting out on my own and i've got my first semmy big job and iam looking for some advise with it.
the kitchen is on the upstairs ring with the boiler so I'm looking at taking it off that ring and putting a new ring in just for the kitchen and moving the cooker point (which also needs putting on the rcd side of the cu)
I have called Lbc and they will come out when first fix is done then when the job is complete and the have told me to do all the testing myself.
Sorry for the long post
the kitchen is on the upstairs ring with the boiler so I'm looking at taking it off that ring and putting a new ring in just for the kitchen and moving the cooker point (which also needs putting on the rcd side of the cu)
I have called Lbc and they will come out when first fix is done then when the job is complete and the have told me to do all the testing myself.
Sorry for the long post