cliffed

-
Arms
Joined
Dec 20, 2009
Messages
2,185
Reaction score
698
Location
Worcester
My tutors told me to use this as a rule of thumb and you shouldn't go wrong, for a ring final circuit "1 roll of 100m cable = 1 ring final circuit", if that's wrong I stand corrected, but my tutors swore by this rule of thumb.
Found this remark on another forum,using 100m, that ring main ain’t gonna go far.
I usually have 2 rolls on the go.
 
Personally no .......... because it would mean lots of inaccessible MF joints but this style of "ring" was used a lot in the 1960's and 1970's

The older houses on my estate have this but the "connections" are at the sockets, so 3 x imperial cable rammed into sockets ..... the fun starts when DIYers start replacing the sockets with ones sourced in big sheds that can't accommodate 3 x imperial cables:)
also see my post #42 which is in agreement with your post #39.
 
I’d imagine that the client must be aware that surface damage to decor is more than likely to occur and if they where that picky about damage I’d probably not do the jobs as it sounds more hassle than it’s worth.
recentlydone job for customer. where used existing capping/tube drops where posssible. minimised repairs to decor, but as a previous set of threads, the bugger owes me ÂŁ750 unpaid ballance. GRRRRR. time for a CCJ.
 
recentlydone job for customer. where used existing capping/tube drops where posssible. minimised repairs to decor, but as a previous set of threads, the bugger owes me ÂŁ750 unpaid ballance. GRRRRR. time for a CCJ.
ÂŁ750 is a lot of beer tokens
 
Nobody has yet come up with a good reason or a good reg against such a circuit.

543.2.9

I’ve Not got my book with me right now - but I believe it states that the CPC’s of a ring final need to be taken all the way back to the origin of the circuit, and for me the origin of a circuit is where the OCPD is. I think the ring of the lollipop is exactly that - a ring. If that ring is wired in 2.5mm and on a 32amp MCB, and the ring continuity is broken....
 
543.2.9

I’ve Not got my book with me right now - but I believe it states that the CPC’s of a ring final need to be taken all the way back to the origin of the circuit, and for me the origin of a circuit is where the OCPD is. I think the ring of the lollipop is exactly that - a ring. If that ring is wired in 2.5mm and on a 32amp MCB, and the ring continuity is broken....
What about a ring that the CPC is the metal conduit?
 
543.2.9

I’ve Not got my book with me right now - but I believe it states that the CPC’s of a ring final need to be taken all the way back to the origin of the circuit, and for me the origin of a circuit is where the OCPD is. I think the ring of the lollipop is exactly that - a ring. If that ring is wired in 2.5mm and on a 32amp MCB, and the ring continuity is broken....

That's the reg covering a standard RFC though isn't it? We aren't talking about a standard 'paint by numbers' RFC.
 
Now you've gone and done it !
Don't think I can connect both ends of the ring CPC to the earthing terminal at the circuit origin if they're out there in the kitchen.
[ElectriciansForums.net] Ring main,going going gone
 
For anyone that is interested!

543.2.9 - Except where the circuit protective conductor is formed by a metal covering or enclosure containing all of the conductors of the ring, the circuit protective conductor of every ring final circuit shall also be run in the form of a ring having both ends connected to the earthing terminal at the origin of the circuit.
 
The regulations can’t accommodate every type of circuit arrangement that’s how I read it.
It’s obvious that a standard ring final circuit shall start and finish at the OCPD all conductors.
Why would the regulations go into every different circuit arrangement?
 

Reply to Ring main,going going gone in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
446
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
CONCLUSION (Couldn't see how to edit title) It was not belting it down with rain today, so lifted the manhole cover. The pump is about 2 metres...
2 3 4
Replies
45
Views
6K
  • Question
By retired electrician, I mean that I have retained my ticket but no longer do installation work. Thanks for the clarification. I missed that it...
Replies
2
Views
512

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top