S
Stashton1990
I have been asked of my club to wire up 2 cabins with power so they can have lights on during the dark mornings. There is 3 metal cabins in total one with a generator in it, one which is the main office and one for meetings. The 2 cabins that want power both have a C.u in them. So if i wire in a 16amp 230v external socket to each of the cabins so they can plug the generator in when they arrive in the morning.
How would i go about earthing them. Would i put and earthing spike in and wire each cabin and the generator back to the spike individually or would i give each cabin a spike each?
How would i go about earthing them. Would i put and earthing spike in and wire each cabin and the generator back to the spike individually or would i give each cabin a spike each?
Last edited: