When adding just a couple of circuits to an existing installation, what exactly do you put on the schedule of results with regards to the old circuits.
Just the circuit number and name or do you add the breaker details also like bsen, type, breaking capacity, rating. Obviously can't add ref method as you didn't do install so don't know all the details, but what about conductor sizes you can see inside CU?
Thanks.
Just the circuit number and name or do you add the breaker details also like bsen, type, breaking capacity, rating. Obviously can't add ref method as you didn't do install so don't know all the details, but what about conductor sizes you can see inside CU?
Thanks.