I have a Seaward PrimeTest 350 and noticed these two options in the auto test menu:
H) IT Equip CLI PE Current
Which does these tests:
Earth Continuity 0.10
Insulation 1.0
PE Conductor Current 3.50
I) IT Equip CLII Touch Current
Insulation 2.0
Touch Current 0.25
Is this correct as I did not think you were suppose to do Leakage Tests for IT Equipment?
Instead I have been using these options:
A) Portable/Handheld/IT CLI
Earth Continuity 0.20
Insulation 1.0
B) Portable/Handheld/IT CLII
Insulation 2.0
I am a bit confused by options H and I on the Auto test menu and would appreciate any advice regarding these.
H) IT Equip CLI PE Current
Which does these tests:
Earth Continuity 0.10
Insulation 1.0
PE Conductor Current 3.50
I) IT Equip CLII Touch Current
Insulation 2.0
Touch Current 0.25
Is this correct as I did not think you were suppose to do Leakage Tests for IT Equipment?
Instead I have been using these options:
A) Portable/Handheld/IT CLI
Earth Continuity 0.20
Insulation 1.0
B) Portable/Handheld/IT CLII
Insulation 2.0
I am a bit confused by options H and I on the Auto test menu and would appreciate any advice regarding these.