D
dave-gardiner
oh no not again.
shed is 100M away. 13 A load.
plastc conduit.
mcb in house 16A type b.
6mm live and neutral thru conduit (plastic) to shed. then earth rod to make TT system and finally rcd in shed. is this ok?
shed is 100M away. 13 A load.
plastc conduit.
mcb in house 16A type b.
6mm live and neutral thru conduit (plastic) to shed. then earth rod to make TT system and finally rcd in shed. is this ok?