or should the spark have walked away????

went to a boiler change today that had been wired ready, the spark that had doen the work had a dis agreement with the owners about the way to run the cable, the owners didnt want mini trunking and they wouldnt pay out for the wall to be chased and made good, this is what they were left with

[ElectriciansForums.net] Should this job have been done

also the new circuit was terminated into light switch instead of a dp switch which it should have been.
 
exept that it wont have been an electrician that did this would it.....no sparky worth a damn will have passed this off as `normal`...or would have even considered risking their reputation on the basis of this sh**e....no guys n girls....this was done by a prop up down`t local bar....

it was an niceic registered company, iv been tasked to put it right next week before we finish the boiler
 
it was an niceic registered company, iv been tasked to put it right next week before we finish the boiler

and how is that going to be done? mini trunking or chasing in the wall that the customer did not want? The op said the boiler supply came from a normal light switch, are you sure it is not a 20 amp double pole switch?
 
maybe customer thought it could be done wireless went to a job once where a woman wanted a socket next to phone point for cordless phone,cu 3m away doesnt want decor disturbed so no chases,and doesnt want trunking asked why it couldnt be done wireless like the phone!
 
Im in shock after seeing this pic ....... i mean pink curtains and bedding on a blue background :confused: if that aint gonner cause your child sexual identity confusion then what is !!!!!
 
Last edited by a moderator:
Was the cable a spur from a socket or the thermostat cable,

Thermostat cable, go wireless
If a 3a supply for the boiler and depending if the boiler was in the loft and taking loading of upstairs lighting into account could a get out of trouble quick fix be come off the lighting circuit, not ideal but hey
 
it was an niceic registered company, iv been tasked to put it right next week before we finish the boiler

and how is that going to be done? mini trunking or chasing in the wall that the customer did not want? The op said the boiler supply came from a normal light switch, are you sure it is not a 20 amp double pole switch?

The customer has agreed to us tidying it up into mt, it was light switch as it was taken off the wall to check


---
I am here: http://tapatalk.com/map.php?rdyltv
 
If the client didn't want MT and didn't want it chased but wanted power to their boiler, I'd say this is exactly what they wanted....
Can't imagine how the conversation must have gone....
"You either get surface minitrunk, or I chase and you make good, which is it?"
"Niether"
"Do you want your boiler to work"
"Yes"
"Fine, here you go"
 
If the client didn't want MT and didn't want it chased but wanted power to their boiler, I'd say this is exactly what they wanted....
Can't imagine how the conversation must have gone....
"You either get surface minitrunk, or I chase and you make good, which is it?"
"Niether"
"Do you want your boiler to work"
"Yes"
"Fine, here you go"

no decent spark would leave ANY job like this regardless
 
the way im reading this is the spark left it like that because customer refused mt or a chase,but the plumber is tasked to put it right,why now and not then?,seems to be a bit of Electrical Trainee nic bashing going on possibly..
 
the way im reading this is the spark left it like that because customer refused mt or a chase,but the plumber is tasked to put it right,why now and not then?,seems to be a bit of Electrical Trainee nic bashing going on possibly..

it was only done a week ago ahead of the new boiler going in, its me that has to put it right not the plumber
 
it was only done a week ago ahead of the new boiler going in, its me that has to put it right not the plumber

are you spark 1 or spark 2,if spark 2 why the change of mind regards the trunk spark 1 wasnt allowed to fit.and why is spark 2 on the job,wheres spark 1 to put any problems right under any warranty period,is spark 2 getting paid to put spark 1's work right..
 

Reply to Should this job have been done in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
300
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
812
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
865

Similar threads

When he bought the bank, they stripped out all the metalwork, iron bars etc for scrap. He was left with the cashier countertops… which have been...
Replies
2
Views
434
  • Question
What attracts me is, i enjoy working in trade i like keeping busy an grafting an getting to be proud when a job is finished, with the electrician...
Replies
3
Views
393

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top