A customer doesn't want a new consumer unit, but wants work doing to an existing lighting and existing ring circuit.
I believe I'm correct in thinking that if I do work on these older circuits, I must then RCD protect them. Is it better to fit an RCD to the incoming mains, before the fuse box, or individually RCD protect each of the two circuits?
Many thanks
EW
A customer doesn't want a new consumer unit, but wants work doing to an existing lighting and existing ring circuit.
I believe I'm correct in thinking that if I do work on these older circuits, I must then RCD protect them. Is it better to fit an RCD to the incoming mains, before the fuse box, or individually RCD protect each of the two circuits?