SMA are now birthing the 4000TL with settings that apply under G59 so when installing a 3.9 pv system all that needs to shown to the DNO is a certificate because the inverter is deemed to automatically comply with regulations and no further tests are required.
Anybody need a copy of the certificate let me know.