solutions for terminating pond pump and lights armoured? | on ElectriciansForums

Discuss solutions for terminating pond pump and lights armoured? in the Australia area at ElectriciansForums.net

S

SparkyDips

as above and just need a solution which is not too vulgar to terminate SWA's and then run feeds to pump and lights.

regards.
 
Maybe an suitable ip rated adaptable box with a din rail fitted and some din rail terminals and a parana nut for maintaining earth continuity should you need to when terminating the swa into the plastic and stuffing glads for the flex
 
yes switched and supplied seperatly. the customer wants them hidden as much as possible, was thinking IP box in the ground but not keep on the resin/silicone to seal afterwards.

other option was mount on a small pedestal on edge of pond area with IP rated switches, armoured into the bottom then also run flex out via stuffing gland??
 
yes switched and supplied seperatly. the customer wants them hidden as much as possible, was thinking IP box in the ground but not keep on the resin/silicone to seal afterwards.

other option was mount on a small pedestal on edge of pond area with IP rated switches, armoured into the bottom then also run flex out via stuffing gland??


If your not keen on compound,what about the Magic Gel I have heard of, it is supposed to be a sealant but removable
 
You could use the LINE Junction Box IP67 kit.

An option would be to use one 3 or 4 core (depending if armour is CPC or not), one common neutral and two switched line - would save on SWA costs. Picture of this arrangement attached. Alternatively use two LINE.

LINE IP67 can be buried but surround it with blinding e.g. soft building sand. CPC continuity is achieved the same way as the large resin pour underground JB's- if you're interested let me know and I will give you details. [ElectriciansForums.net] solutions for terminating pond pump and lights armoured?
 
think i will do the following: terminate armoured into IP rated junction box, adaptaflex out to 2 gang switch on pedestal, adaptaflex from switch to equipment.

can keep pedestal pretty low level so not sticking out too bad. IP junction boxes can then be hidden easily.

thanks LineProducts will bear this in mind.
 

Reply to solutions for terminating pond pump and lights armoured? in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
291
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
800
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
828

Similar threads

Adding a led strip isn't going to make much difference to the 3 phase balance. No real difference to where a 3 phase machine uses one phase to...
Replies
2
Views
319
I think I've found the answers to my questions... I can just do a straight forward wiring i.e. connect the 3 wires from the armoured cable to...
Replies
7
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top