hi guys
Could be wrong but doing a condition report and come across this. Pretty typical for this block of maisonettes to have swa coming from the main building supply into an adaptable box and this set up.
However I've noticed this one has the neutral go straight into the main switch and has a link from the meter....
Could be fine but something is just saying it doesn't feel right.
Is this OK or not??
Could be wrong but doing a condition report and come across this. Pretty typical for this block of maisonettes to have swa coming from the main building supply into an adaptable box and this set up.
However I've noticed this one has the neutral go straight into the main switch and has a link from the meter....
Could be fine but something is just saying it doesn't feel right.
Is this OK or not??