Appologies if Ofgem have answered this in their guidance and I've missed it, but we've got an installation coming up on a new build very low energy house (not quite passif house standard, but not far off).
Anyway, we're going to be doing the solar PV installation significantly before the house would usually be complete enough to do an EPC, as for instance there is currently no gas supply connected, so there's no boiler installed yet.
The house has a SAP estimate completed which shows it should get a high B on the EPC when completed, but I'm unsure whether it would be accpetable to submit this with the FIT application, or submit an EPC at the point when the house actually accrues enough points to get a D rating?
Also, does anyone know if there are any time limits on the time allowed from the installation date to the date the FIT application is submitted?
any assistance appreciated.
Anyway, we're going to be doing the solar PV installation significantly before the house would usually be complete enough to do an EPC, as for instance there is currently no gas supply connected, so there's no boiler installed yet.
The house has a SAP estimate completed which shows it should get a high B on the EPC when completed, but I'm unsure whether it would be accpetable to submit this with the FIT application, or submit an EPC at the point when the house actually accrues enough points to get a D rating?
Also, does anyone know if there are any time limits on the time allowed from the installation date to the date the FIT application is submitted?
any assistance appreciated.