Hi Everyone.
Sorry if this has come up time and time again.
Soon to be installing a 3 phase submain and DB to very large garage with living annex above and lighting the external etc. (Domestic Dwelling).
Trying to get my head around this SPD jargon.
TNCS system, will i need to install a SPD at the 3 phase Isolator (type 1) and then a from DB a Type 2?
Done the Risk Assessment, and client has agreed with adding this protection into his property, and also wish to install to his 3 x single phase boards (1 on each phase) at a later date.
Thanks all.
regards
Dan
Sorry if this has come up time and time again.
Soon to be installing a 3 phase submain and DB to very large garage with living annex above and lighting the external etc. (Domestic Dwelling).
Trying to get my head around this SPD jargon.
TNCS system, will i need to install a SPD at the 3 phase Isolator (type 1) and then a from DB a Type 2?
Done the Risk Assessment, and client has agreed with adding this protection into his property, and also wish to install to his 3 x single phase boards (1 on each phase) at a later date.
Thanks all.
regards
Dan